How to start repair works associated with the apartment?

The initial stage of the particular repair of old apartments is the destruction and taking out first of almost all from the dilapidated walls and partition surfaces, removing the walls and ceiling layer. This stage will be one of the particular most “dirty” levels of the repair.

A single more among the most essential and “dusty” performs is the windowpane block replacement. It is necessary to do this very first of all due to the fact dirt and dirt is going to be unallowable throughout following stages and it is prohibited at all to open windows throughout painting and wallpapers works (large falls of the temp and moisture are usually unallowable). After mounting windows and windowsills it is essential to pack these people immediately in polyethylene film and to cover windowsills within addition by the fiberboard (in in an attempt to stop scratches).

The next stage is wiring. Electrical wiring can be installed in walls or even along the flooring. Wiring is made inside the pipes to ensure power safety and boost reliability. The water pipe protects wiring coming from external damages plus allows to substitute the wire totally without breaking wall space and floor simply by inserting the newest wire instead regarding the old 1.

House Painting comes after the wiring. The particular frequent mistake in the course of the simultaneous executing of such functions occurs when staff forget to lay down out one of many wires and house painters have already covered and smoothed out your wall. As the result, additional functions are necessary to be able to seal chases on the finished wall. The particular places of the feed switch in addition to wall outlet place and their number must be thought-out inside advance. The plan of power electrical wiring is usually included in to the design project.

Later on the program must be prepared to service in circumstance of failures. Within addition to the wirings, the phone cable and the TELEVISION cable are organized. The power cable connection really should not be laid out near the phone and antenna wires to avoid sound pickup and interference. Probably the most peculiar second is laying out there the TV cable. In order in order to make two (or three) TV makes its presence felt the apartment the second cable is frequently simply “firmly soldered” in parallel, thus the cable opposition is lowered. Because a result, the display quality is deteriorated, many programs can’t be received in addition to etc. In order to avoid this kind of situation it is usually necessary to request a specialist along with special equipment. This individual will gauge the transmission level of typically the each TV-feeder and install TV-amplifiers or TV-filters.

Painting is considered the most long-term process, this is why it is performed simultaneously in just about all premises, when it is feasible. Delays are associated with the technology. Each applied coating of the plastsorter (or filling in finishing) must dry completely before the job will continue.

Works in sanitary arrangements and the kitchen begin simultaneously with house painting. http://paintedpawsuk.com is better to fulfill alleged “dirty” works within the first spot and simultaneously. In accordance with the plan of the sanitary technician location welded, wall chasing and pipe run are conducted. Steam rad admissions are ready, taps and mounting brackets are mounted, yet radiators aren’t set up.

Then works in sanitary arrangements are usually conducted according to the strategy. The bath will be mounted, then surfaces are smoothed out and the ceramic tile is laid on walls. The following stage is assembling ceiling and putting tiles on the floor. And from last other hygienic devices, mixers and accessories are mounted.

After wiring, installation of rosette discs and terminal bins the voltage is checked in every point. Ends of wiring are insulated plus laid out in to rosette plates. Electrical sockets and breakers aren’t installed during this specific stage in buy to save their own surface appearance. Typically the finish puttying regarding walls is conducted simultaneously. The scientifically exact control over drying of the layer of the plastsorter (filling) is taken out by drymeter. It is a special instrument of which measures moisture of the material.

These stage is typically the means of fill. Load may be made along with different materials : from usual brickwork cement-sand mixture in order to self-aligning floors. The advantage of the simple mixture will be its cheapness, the particular disadvantage is of which such mixture is much harder aligned at the degree and the last dry time associated with such fill will be 40 days, simply then the subsequent stage of typically the work together with floor could be conducted, i. e. the time is usually too long. Self-leveling self-aligning floors are much more expensive, but more technological. Aiming occurs almost “automatically” i. e. liquid solution of combination is poured away, then it operates and you get the horizontal surface area. The final dry out time is two weeks i. e. you have significant time economy. The system “warm floor” is mounted in to the fill. If the so-called “wet processes” are inapplicable the technology associated with the dry aligning (the fill technology) is used bases for floors together with adjustable floor battens are mounted.

Following fill door containers and door are installed. Installing of doorways must take into the account density of future floor covering. After installation the door can be obtained off its handles and removed right up until the end regarding repair or jam-packed into polyethylene film to protect coming from damages. Simultaneously threshold could be painted in addition to the tile could be laid in this premises where it absolutely was planned. The ceramic tile must be put within the absolutely dry overlay.

Finishing regarding the floor installation depends on the planned covering. Within most cases (if finish covering is not the tile) fill up is covered simply by bitumen mastic in addition to plywood sheets are usually laid. They usually are fixed to the floor by self-tapping anchoring screws. One plywood linen is fixed by 30-50 self-tapping screws to provide the close fixing regarding plywood and long-term service of the floor without squeak plus bulging. The hdf gives the added heat- and acoustic insulation. After increasing of the hdf is completed, wallpaper regarding painting can become pasted on wall space.

In premises exactly where finish covering associated with the floor will be laminated flooring or perhaps parquet hoard, the normal wallpapers are pasted (not for painting) in the very first place. Then typically the floor covering is mounted.

If finish addressing of the floor will be the block parquet, the parquet is usually laid in the first place, after that it is scraped and covered by simply one layer of lacquer. After this the ordinary wall-papers are pasted plus the parquet is included in the rest levels of lacquer (depending on the quality of the parquet in addition to lacquer). The mentioned consequence is associated only with this kind of scrambling process whenever the great amount of dust is usually created. In spite of the fact that great floor grinders usually are equipped with typically the vacuum cleaner, typically the sufficient amount associated with dust is brought on on surrounding topics including walls. Dirt is very pickled and is badly washed off. That will is why so as not to damage wallpapers, they usually are pasted after scrambling and in purchase the parquet usually do not absorb the excessive moisture it is usually covered by the main one layer of ename before wallpaper pasting.

After this the main works may be considered in order to be finished. This is left only to install the plinths, decorative elements, breakers and sockets, drape holders, to hang up doors, plant-bands and others.

In conclusion that is necessary to note that the particular sequence of works was listed in general and can change depending on the definite situation – the particular number of areas in premise, your own resources, peculiarities associated with the construction regarding the multilevel building. It is centered on common sense plus every person effective at analysis can individually create such the sequence.